The following bill of materials example shows how this is constructed, using a multi level bill of materials.
The drawing above shows an example trolley for moving heavy items. Though our example may not be the best designed trolley around, it is simplified to show off the different assemblies, raw materials. The example also shows how the bill of materials can easily be modified due to a change in the design.
In this bill of materials example we will start at the top level, and drill our way down to the individual components. To simplify things in this example, the bill of materials has some basic information omitted e.g. cost for clarity. Also to keep things simple, the bill of materials has a maximum of 4 levels deep.
At the top level there are only two different parts:
Example 1
Level | Part No | Description | Group | Unit | QTY | Waste % | Ext QTY |
1 | 120-001 | Trolley, 3 wheeled | Assy | EA | 1.0000 | 0.0000 | 1.0000 |
2 | 112-001 | Plywood Platform | Part | EA | 1.0000 | 0.0000 | 1.0000 |
2 | 110-001 | Wheel Housing | Assy | EA | 3.0000 | 0.0000 | 3.0000 |
For the plywood platform, this is quite simple and has a separate bill of materials. under part no. 112-001.
Example 2
Level | Part No | Description | Group | Unit | QTY | Waste % | Ext QTY |
1 | 112-001 | Plywood Platform | Part | EA | 1.0000 | 0.0000 | 1.0000 |
2 | 106-001 | Plywood,12mm,2400×1200 | RM | SH | 0.1250 | 0.0000 | 0.1250 |
2 | 111-006 | Varnish, Semi Gloss | PR | L | 0.0500 | 0.1000 | 0.0501 |
2 | 130-001 | Labor | LB | HR | 0.6500 | 0.0000 | 0.6500 |
With the bill of materials above the assembly contains all the raw materials and labor to manufacture that part.
The wheel assembly also has a bill of materials, but has a quantity of 3
Example 3
Level | Part No | Description | Group | Unit | QTY | Waste % | Ext QTY |
1 | 110-001 | Wheel Housing | Assy | EA | 3.0000 | 0.0000 | 3.0000 |
2 | 110-001 | Side Piece | Part | EA | 2.0000 | 0.0000 | 2.0000 |
2 | 110-002 | Top Piece | Part | EA | 1.0000 | 0.0000 | 1.0000 |
2 | 102-108 | Wheel, with tyre, 100mm | Part | EA | 1.0000 | 0.0000 | 1.0000 |
2 | 100-001 | MS Bolt, M10x70, Galv | Fast | EA | 1.0000 | 0.0000 | 1.0000 |
2 | 100-002 | M10, washer, Galv | Fast | EA | 2.0000 | 0.0000 | 2.0000 |
2 | 100-003 | M10, Nut, Galv | Fast | EA | 3.0000 | 0.0000 | 3.0000 |
2 | 100-004 | MS Bolt, M10x30, Galv | Fast | EA | 1.0000 | 0.0000 | 1.0000 |
2 | 100-005 | M10 Square Nut | Fast | EA | 1.0000 | 0.0000 | 1.0000 |
This assembly has a number of raw materials, but also two parts, each which have a further bill of materials, the top piece & side piece.
The Side piece part is used twice in the wheel housing, and the top piece part is used once.
The Side piece bill of materials is listed below:
Example 4
Level | Part No | Description | Group | Unit | QTY | Waste % | Ext QTY |
1 | 110-001 | Side Piece | Part | EA | 2.0000 | 0.0000 | 2.0000 |
2 | 105-001 | MS Flat 80×8 | RM | M | 0.1000 | 5.0000 | 0.1050 |
2 | 111-001 | Galvanising | PR | KG | 0.0010 | 0.0000 | 0.0010 |
2 | 130-000 | Labor | LB | HR | 0.1000 | 0.0000 | 0.1000 |
And likewise the top piece bill of material is listed below:
Example 5
Level | Part No | Description | Group | Unit | QTY | Waste % | Ext QTY |
1 | 110-002 | Top Piece | Part | EA | 1.0000 | 0.0000 | 1.0000 |
2 | 105-001 | MS Flat 80×8 | RM | M | 0.0500 | 5.0000 | 0.0525 |
2 | 111-001 | Galvanising | PR | KG | 0.0010 | 0.0000 | 0.0010 |
2 | 130-000 | Labor | LB | HR | 0.5000 | 0.0000 | 0.5000 |
When the multi level entire wheel assembly is put together, we use the list from example 3, but as the top piece and side piece have their own separate bill of materials, the levels of all the parts used in examples 4 & 5 are carried down one. The entire bill of materials for the wheel assembly is listed below:
Example 6
Level | Part No | Description | Group | Unit | QTY | Waste % | Ext QTY |
1 | 110-001 | Wheel Housing | Assy | EA | 3.0000 | 0.0000 | 3.0000 |
2 | 110-001 | Side Piece | Part | EA | 2.0000 | 0.0000 | 2.0000 |
3 | 105-001 | MS Flat 80×8 | RM | M | 0.1000 | 5.0000 | 0.1050 |
3 | 111-001 | Galvanising | PR | KG | 0.0010 | 0.0000 | 0.0010 |
3 | 130-000 | Labor | LB | HR | 0.1000 | 0.0000 | 0.1000 |
2 | 110-002 | Top Piece | Part | EA | 1.0000 | 0.0000 | 1.0000 |
3 | 105-001 | MS Flat 80×8 | RM | M | 0.0500 | 5.0000 | 0.5250 |
3 | 111-001 | Galvanising | PR | KG | 0.0010 | 0.0000 | 0.0010 |
3 | 130-000 | Labor | LB | HR | 0.5000 | 0.0000 | 0.5000 |
2 | 102-108 | Wheel, with tyre, 100mm | Part | EA | 1.0000 | 0.0000 | 1.0000 |
2 | 100-001 | MS Bolt, M10x70, Galv | Fast | EA | 1.0000 | 0.0000 | 1.0000 |
2 | 100-002 | M10, washer, Galv | Fast | EA | 2.0000 | 0.0000 | 2.0000 |
2 | 100-003 | M10, Nut, Galv | Fast | EA | 3.0000 | 0.0000 | 3.0000 |
2 | 100-004 | MS Bolt, M10x30, Galv | Fast | EA | 1.0000 | 0.0000 | 1.0000 |
2 | 100-005 | M10 Square Washer | Fast | EA | 1.0000 | 0.0000 | 1.0000 |
When the entire bill of materials is put together, combined with the plywood platform, all the levels in the wheel assembly again move down a level.
Example 7
Level | Part No | Description | Group | Unit | QTY | Waste % | Ext QTY |
1 | 120-001 | Trolley, 3 wheeled | Assy | EA | 1.0000 | 0.0000 | 1.0000 |
2 | 112-001 | Plywood Platform | Part | EA | 1.0000 | 0.0000 | 1.0000 |
3 | 106-001 | Plywood,12mm,2400×1200 | RM | SH | 0.1250 | 0.0000 | 0.1250 |
3 | 111-006 | Varnish, Semi Gloss | PR | L | 0.0500 | 0.1000 | 0.0501 |
3 | 130-001 | Labor | LB | HR | 0.6500 | 0.0000 | 0.6500 |
2 | 110-001 | Wheel Housing | Assy | EA | 3.0000 | 0.0000 | 3.0000 |
3 | 110-001 | Side Piece | Part | EA | 2.0000 | 0.0000 | 2.0000 |
4 | 105-001 | MS Flat 80×8 | RM | M | 0.1000 | 5.0000 | 0.1050 |
4 | 111-001 | Galvanising | PR | KG | 0.0010 | 0.0000 | 0.0010 |
4 | 130-000 | Labor | LB | HR | 0.1000 | 0.0000 | 0.1000 |
3 | 110-002 | Top Piece | Part | EA | 1.0000 | 0.0000 | 1.0000 |
4 | 105-001 | MS Flat 80×8 | RM | M | 0.0500 | 5.0000 | 0.0525 |
4 | 111-001 | Galvanising | PR | KG | 0.0010 | 0.0000 | 0.0010 |
4 | 130-000 | Labor | LB | HR | 0.5000 | 0.0000 | 0.5000 |
3 | 102-108 | Wheel, with tyre, 100mm | Part | EA | 1.0000 | 0.0000 | 1.0000 |
3 | 100-001 | MS Bolt, M10x70, Galv | Fast | EA | 1.0000 | 0.0000 | 1.0000 |
3 | 100-002 | M10, washer, Galv | Fast | EA | 2.0000 | 0.0000 | 2.0000 |
3 | 100-003 | M10, Nut, Galv | Fast | EA | 3.0000 | 0.0000 | 3.0000 |
3 | 100-004 | MS Bolt, M10x30, Galv | Fast | EA | 1.0000 | 0.0000 | 1.0000 |
3 | 100-005 | M10 Square Nut | Fast | EA | 1.0000 | 0.0000 | 1.0000 |
If you see from the example above, it is easy to change the bill of materials should the quantity change from a three wheel to a four wheel design, by simply adjusting the quantities associated with the plywood platform and the wheel housing (part 110-001) from a quantity of 3 to 4